We Buy Used Racking

case studies

4f4fbcec-e0f7-49fd-9166-df1a49978808.jpg

Swiss Post Solutions

We had a call from a client asking us to dismantle and remove their Link 51 pallet racking, This was a very straight parcel with a good ratio of beams to uprights. The guys started and finished this job in 3 days. 

Swiss Post Solutions Read More »

60985efc-9498-4ef6-a2e1-b593c54ad646.jpg

COH Baines

We had a lovely parcel of Longspan racking from a company over in Tunbridge Wells, this will not last long in our warehouse as it's very clean and the perfect size for all the small internet businesses needing pick and pack shelving. 

COH Baines Read More »

0fceb42b-f4dc-440a-9ed3-e2fb79aab785.jpg

Real Trade Ltd

We had a client call asking us to remove his Esmena pallet racking from his warehouse over in Feltham as he needed to give back the warehouse at the end of the week, the lads shot over and removed everything over a 2 day period making our clients deadline.  

Real Trade Ltd Read More »

4080f043-bb19-457f-a5b0-294324d07e6b.jpg

KANEGRADE LTD

We had a call from a client asking us to Purchase their unwanted Link 51 Pallet Racking, A nice parcel of 2700mm beams with 1100mm deep frames. a nice parcel to start the year with all the end barriers & mesh paneling.  

KANEGRADE LTD Read More »

00bf126f-5d9f-4926-990c-017a9a63e318.jpg

DB Schenker

Today we stripped out a double run of Planned Storage Strongspan racking to allow the the company some more floor space to clear the rest of the warehouse stock. 

DB Schenker Read More »

36b4474f-ff03-4815-b764-24c6ee3ae26a.jpg

Metal & Modular

We had a call from a client asking us to remove Link 51 pallet racking from 4 warehouse location across their farm, A company had been using it as document storage so we had our work cut out with removing large sheets of chipboard.

Metal & Modular Read More »

30e0957e-a967-4443-a5f0-c446139196cb.jpg

Technicolor

We had a client call from Rugby asking us to clear there warehouse of Dexion Speedlock pallet racking, Dexion shelving & some small delapse. This was a 3 week project in total and it took every day to clear the site. 

Technicolor Read More »

acee03d0-dacd-4d1f-b243-b295ed44784b.jpg

Anchor Bay

We had a call from a client asking us to remove Dexion Speedlock and Bitto P4 pallet racking form a construction supplier based in Erith Kent, The guys took 4 days to clear the site and left the warehouse clean and tidy.

Anchor Bay Read More »

01ba7165-9e57-4359-a9c9-29bd4dc03138.jpg

Pharmacy Link

We had a call from a client asking us to strip out his warehouse in Woking, he had a very clean parcel of Mecalux pallet racking 5000mm x 900mm uprights with 3300mm beams. This will not hang around in stock for long. 

Pharmacy Link Read More »